The site of the project implemented in this field is located at Takestan City and the project specifications are as follows:

A diversion dam with a height of 2 to 4 meters and a length of 30 m

  • An inlet span with a capacity of 4 m3/sec
  • A conduit with a maximum capacity of 4 m3/sec and a length of 700 m 
  • A tank outside of the river bed with a capacity of one million cubic meters
  • An earth dam surrounding the tank with a capacity of 350,000 m3 and a height of 13 m