The site of the project implemented in this field is located at Takestan City and the project specifications are as follows:
A diversion dam with a height of 2 to 4 meters and a length of 30 m
- An inlet span with a capacity of 4 m3/sec
- A conduit with a maximum capacity of 4 m3/sec and a length of 700 m
- A tank outside of the river bed with a capacity of one million cubic meters
- An earth dam surrounding the tank with a capacity of 350,000 m3 and a height of 13 m