A completed project in this field is located at Firouzkouh City and includes the following works:
Conducting landscaping operations of Faraz Cement Plant in Firouzkouh (including the construction of streets, culverts for the collections of surface water, pavement, asphalt pavements, etc.)
Conducting construction works and finishing the structure and architecture of a part of production line and peripheral buildings for the Faraz Cement Plant of Firouzkouh, which included the following buildings: 

  • Crusher Control Room; 
  • Light And Heavy Weight Floorings; 
  • Cooling Tower; 
  • Oil Furnaces; 
  • Diesel Generator; 
  • Fuel And Facility Channels; 
  • Tap Water Reserves; 
  • Firebrick Storage; 
  • Bascules; 
  • Furnace Analyzer Room; 
  • Grate Furnace Hydraulics Room; 
  • Lobe Silo Foundation And The Foundation Beneath The Electro-Filter; 
  • Chroming And Sloping Of Silo Ceilings.