{"id":426,"date":"2015-06-30T10:30:30","date_gmt":"2015-06-30T06:00:30","guid":{"rendered":"http:\/\/baadbandsaz.com\/en\/projects\/completed-projects\/wastewater-collection\/"},"modified":"2015-06-30T10:30:30","modified_gmt":"2015-06-30T06:00:30","slug":"wastewater-collection","status":"publish","type":"page","link":"https:\/\/baadbandsaz.com\/en\/projects\/completed-projects\/wastewater-collection\/","title":{"rendered":"Wastewater Collection"},"content":{"rendered":"<div class=\"art-content-layout-wrapper layout-item-0\">\n<div class=\"art-content-layout layout-item-1\">\n<div class=\"art-content-layout-row\">\n<div class=\"art-layout-cell layout-item-2\" style=\"width: 100%\" >\n<h3>1. Piping works for the wastewater network of District 2 of Area NW 1-3, segment three:<\/h3>\n<\/p>\n<ul>\n<li><span style=\"line-height: normal;\">Employer: Tehran Wastewater Company&nbsp;<\/span><\/li>\n<li><span style=\"line-height: normal;\">Consultant: Rayab Consulting Engineers Co.<\/span><\/li>\n<li><span style=\"line-height: normal;\">Contract price: 1.745.000.000 Rials&nbsp;<\/span><\/li>\n<li><span style=\"line-height: normal;\">Project status: FAC&nbsp;<\/span><\/li>\n<li><span style=\"line-height: normal;\">Progress: 100%<\/span><\/li>\n<li><span style=\"line-height: normal;\">Brief description:<\/span><\/li>\n<\/ul>\n<blockquote><p>Performance of Piping Works for a Wastewater Polyethylene Pipeline with diameter of 250mm x 4,734m (in traditional tunneling method) and implementation of 132 concrete manholes<\/p><\/blockquote><\/div>\n<\/p><\/div>\n<\/div>\n<\/div>\n<div class=\"art-content-layout-wrapper layout-item-0\">\n<div class=\"art-content-layout layout-item-1\">\n<div class=\"art-content-layout-row\">\n<div class=\"art-layout-cell layout-item-2\" style=\"width: 100%\" >\n<h3>2.\tPiping works for the Wastewater network of Saa\u2019dat Abad , Area 2NW :<\/h3>\n<\/p>\n<ul>\n<li><span style=\"line-height: normal;\">Employer: Tehran Wastewater Company&nbsp;<\/span><\/li>\n<li><span style=\"line-height: normal;\">Consultant: Rayab Consulting Engineers Co.<\/span><\/li>\n<li><span style=\"line-height: normal;\">Contract price: 498.000.000 Rials&nbsp;<\/span><\/li>\n<li><span style=\"line-height: normal;\">Project status: FAC&nbsp;<\/span><\/li>\n<li><span style=\"line-height: normal;\">Progress: 100%<\/span><\/li>\n<li><span style=\"line-height: normal;\">Brief description:<\/span><\/li>\n<\/ul>\n<\/p>\n<blockquote><p>Performance of Piping Works for a Wastewater Polyethylene Pipeline with diameter of 600mm x 689m (in traditional tunneling method) and implementation of 22 concrete manholes<\/p><\/blockquote>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<\/div>\n<div class=\"art-content-layout-wrapper layout-item-0\">\n<div class=\"art-content-layout layout-item-1\">\n<div class=\"art-content-layout-row\">\n<div class=\"art-layout-cell layout-item-2\" style=\"width: 100%\" >\n<h3>3.\tPiping works for the wastewater network of District 2 of Area NW 1-3, segment four:<\/h3>\n<\/p>\n<ul>\n<li><span style=\"line-height: normal;\">Employer: Tehran Wastewater Company&nbsp;<\/span><\/li>\n<li><span style=\"line-height: normal;\">Consultant: Rayab Consulting Engineers Co.<\/span><\/li>\n<li><span style=\"line-height: normal;\">Contract price: 1.753.000.000 Rials&nbsp;<\/span><\/li>\n<li><span style=\"line-height: normal;\">Project status: FAC&nbsp;<\/span><\/li>\n<li><span style=\"line-height: normal;\">Progress: 100%<\/span><\/li>\n<li><span style=\"line-height: normal;\">Brief description:<\/span><\/li>\n<\/ul>\n<blockquote><p>Performance of Piping Works for a Wastewater Polyethylene Pipeline with diameter of 250-400 mm x 869-3922 m (Total 4784 m), (in traditional tunneling method) and implementation of 111 concrete manholes.<\/p><\/blockquote>\n<p><span style=\"line-height: normal;\"><\/span><\/p>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<\/div>\n<div class=\"art-content-layout-wrapper layout-item-0\">\n<div class=\"art-content-layout layout-item-1\">\n<div class=\"art-content-layout-row\">\n<div class=\"art-layout-cell layout-item-2\" style=\"width: 100%\" >\n<h3>4.\tPiping works for the wastewater network of Moshiriyeh, Area 5SE2:<\/h3>\n<\/p>\n<ul>\n<li><span style=\"line-height: normal;\">Employer: Tehran Wastewater Company&nbsp;<\/span><\/li>\n<li><span style=\"line-height: normal;\">Consultant: Mahab Ghods Consulting Engineers Co.<\/span><\/li>\n<li><span style=\"line-height: normal;\">Contract price: 385.000.000 Rials&nbsp;<\/span><\/li>\n<li><span style=\"line-height: normal;\">Project status: FAC&nbsp;<\/span><\/li>\n<li><span style=\"line-height: normal;\">Progress: 100%<\/span><\/li>\n<li><span style=\"line-height: normal;\">Brief description:<\/span><\/li>\n<\/ul>\n<blockquote><p>Performance of Piping Works for a Wastewater Polyethylene Pipeline with diameter of 250-300 mm x 400-3100 m (Total 3500 m), (in traditional tunneling method) and implementation of 63 concrete manholes<\/p><\/blockquote>\n<p><span style=\"line-height: normal;\"><\/span><\/p>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<\/div>\n<div class=\"art-content-layout-wrapper layout-item-0\">\n<div class=\"art-content-layout layout-item-1\">\n<div class=\"art-content-layout-row\">\n<div class=\"art-layout-cell layout-item-2\" style=\"width: 100%\" >\n<h3>5.\tPiping works for the wastewater network of Saa\u2019dat Abad , Area 1-2NW-6 &amp; NW2.<\/h3>\n<\/p>\n<ul>\n<li><span style=\"line-height: normal;\">Employer: Tehran Wastewater Company<\/span><\/li>\n<li><span style=\"line-height: normal;\">Financer: World Bank<\/span><\/li>\n<li><span style=\"line-height: normal;\">Consultant: Rayab Consulting Engineers Co.<\/span><\/li>\n<li><span style=\"line-height: normal;\">Contract price: 5.488.000.000 Rials<\/span><\/li>\n<li><span style=\"line-height: normal;\">Project status: FAC<\/span><\/li>\n<li><span style=\"line-height: normal;\">Progress: 100%<\/span><\/li>\n<li><span style=\"line-height: normal;\">Brief description:<\/span><\/li>\n<\/ul>\n<blockquote><p>Performance of Piping Works for a Wastewater Polyethylene Pipeline with diameter of 250-300-400 mm x 364-300-13326 m (Total 13990 m), (in traditional tunneling method) and implementation of 400 concrete manholes<\/p><\/blockquote>\n<p>\n    <\/div>\n<\/p><\/div>\n<\/div>\n<\/div>\n<div class=\"art-content-layout-wrapper layout-item-0\">\n<div class=\"art-content-layout layout-item-1\">\n<div class=\"art-content-layout-row\">\n<div class=\"art-layout-cell layout-item-2\" style=\"width: 100%\" >\n<h3>6.\tPiping works for the wastewater network Saa\u2019dat Abad , Area NW 1-4<\/h3>\n<\/p>\n<ul>\n<li><span style=\"line-height: normal;\">Employer: Tehran Wastewater Company&nbsp;<\/span><\/li>\n<li><span style=\"line-height: normal;\">Consultant: Rayab Consulting Engineers Co.<\/span><\/li>\n<li><span style=\"line-height: normal;\">Contract price: One 1.713.000.000 Rials&nbsp;<\/span><\/li>\n<li><span style=\"line-height: normal;\">Project status: FAC&nbsp;<\/span><\/li>\n<li><span style=\"line-height: normal;\">Progress: 100%<\/span><\/li>\n<li><span style=\"line-height: normal;\">Brief description:<\/span><\/li>\n<\/ul>\n<blockquote><p>Performance of Piping Works for a Wastewater Polyethylene Pipeline with diameter of 250-300-400 mm x 551-319-4549 m (Total 5419 m). (in traditional tunneling method) and implementation of 114 concrete manholes.<\/p><\/blockquote>\n<p><span style=\"line-height: normal;\"><\/span><\/p>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<\/div>\n<div class=\"art-content-layout-wrapper layout-item-0\">\n<div class=\"art-content-layout layout-item-3\">\n<div class=\"art-content-layout-row\">\n<div class=\"art-layout-cell layout-item-2\" style=\"width: 100%\" >\n<h3>7.\tPiping works for the wastewater network of District 4 of Area NE 3-2 Tehran Pars, segment 5.<\/h3>\n<\/p>\n<ul>\n<li><span style=\"line-height: normal;\">Employer: Tehran Wastewater Company&nbsp;<\/span><\/li>\n<li><span style=\"line-height: normal;\">Consultant: Pars Ab Tadbir Consulting Engineers Co.<\/span><\/li>\n<li><span style=\"line-height: normal;\">Contract price: 6.183.000.000 Rials&nbsp;<\/span><\/li>\n<li><span style=\"line-height: normal;\">Project status: FAC&nbsp;<\/span><\/li>\n<li><span style=\"line-height: normal;\">Progress: 100%<\/span><\/li>\n<li><span style=\"line-height: normal;\">Brief description:<\/span><\/li>\n<\/ul>\n<blockquote><p>Performance of Piping Works for a Wastewater Polyethylene Pipeline with diameter of 250-300-500-600-700 mm x 9152-538-1984-171-78 m (Total 11323 m) (in traditional tunneling method) and implementation of 218 concrete manholes.<\/p><\/blockquote>\n<p><span style=\"line-height: normal;\"><\/span><\/p>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<\/div>\n<div class=\"art-content-layout-wrapper layout-item-0\">\n<div class=\"art-content-layout layout-item-1\">\n<div class=\"art-content-layout-row\">\n<div class=\"art-layout-cell layout-item-2\" style=\"width: 100%\" >\n<h3>8.\tPiping works for the wastewater network of District 4 of Area NE 3-3 Tehran Pars, segment A.<\/h3>\n<\/p>\n<ul>\n<li><span style=\"line-height: normal;\">Employer: Tehran Wastewater Company&nbsp;<\/span><\/li>\n<li><span style=\"line-height: normal;\">Consultant: Pars Ab Tadbir Consulting Engineers Co.<\/span><\/li>\n<li><span style=\"line-height: normal;\">Contract price: 4.506.000.000 Rials&nbsp;<\/span><\/li>\n<li><span style=\"line-height: normal;\">Project status: FAC&nbsp;<\/span><\/li>\n<li><span style=\"line-height: normal;\">Progress: 100%<\/span><\/li>\n<li><span style=\"line-height: normal;\">Brief description:<\/span><\/li>\n<\/ul>\n<blockquote><p>Performance of Piping Works for a Wastewater Polyethylene Pipeline with diameter of 250-300-400-500 mm x 7930-1665-186-364 (Total 10145 m) (in traditional tunneling method) and implementation of 201 concrete manholes.<\/p><\/blockquote>\n<p><span style=\"line-height: normal;\"><\/span><\/p>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<\/div>\n<div class=\"art-content-layout-wrapper layout-item-0\">\n<div class=\"art-content-layout layout-item-1\">\n<div class=\"art-content-layout-row\">\n<div class=\"art-layout-cell layout-item-2\" style=\"width: 100%\" >\n<h3>9.\tPiping works for the wastewater network of Razan in Hamedan Province<\/h3>\n<\/p>\n<ul>\n<li><span style=\"line-height: normal;\">Employer: Hamedan Water &amp;Wastewater Company&nbsp;<\/span><\/li>\n<li><span style=\"line-height: normal;\">Financer: World Bank<\/span><\/li>\n<li><span style=\"line-height: normal;\">Consultant: Mahab Ghodss Consulting Engineers Co.<\/span><\/li>\n<li><span style=\"line-height: normal;\">Contract price: 7.499.000.000 Rials&nbsp;<\/span><\/li>\n<li><span style=\"line-height: normal;\">Project status: FAC&nbsp;<\/span><\/li>\n<li><span style=\"line-height: normal;\">Progress: 100%<\/span><\/li>\n<li><span style=\"line-height: normal;\">Brief description:<\/span><\/li>\n<\/ul>\n<blockquote><p>Performance of Piping Works for a Wastewater Polyethylene Pipeline with diameter of 250-300-350-400 mm x 79308367- 208- 941 and 647 m (Total 10163 m), (in traditional tunneling method) and implementation of 208 concrete manholes.<\/p><\/blockquote>\n<p><span style=\"line-height: normal;\"><\/span><\/p>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<\/div>\n<div class=\"art-content-layout-wrapper layout-item-0\">\n<div class=\"art-content-layout layout-item-1\">\n<div class=\"art-content-layout-row\">\n<div class=\"art-layout-cell layout-item-2\" style=\"width: 100%\" >\n<h3>10.\tPiping works for the wastewater network of Saa\u2019dat Abad and Farahzad<\/h3>\n<\/p>\n<ul>\n<li><span style=\"line-height: normal;\">Employer: Tehran Wastewater Company&nbsp;<\/span><\/li>\n<li><span style=\"line-height: normal;\">Consultant: Rayab Consulting Engineers Co.<\/span><\/li>\n<li><span style=\"line-height: normal;\">Contract price: 1.551.000.000 Rials&nbsp;<\/span><\/li>\n<li><span style=\"line-height: normal;\">Project status: FAC&nbsp;<\/span><\/li>\n<li><span style=\"line-height: normal;\">Progress: 100%<\/span><\/li>\n<li><span style=\"line-height: normal;\">Brief description:<\/span><\/li>\n<\/ul>\n<blockquote>\n<ol>\n<li><span style=\"line-height: normal;\">Polyethylene Piping Works inside reinforced concrete Pips with diameter of 1000 mm; in pipe jacking and tunneling methods, as per below detail:<\/span><\/li>\n<li><span style=\"line-height: normal;\">315 mm x 184m Polyethylene Pipes inside steel casings with diameter of 1000 mm<\/span><\/li>\n<li><span style=\"line-height: normal;\">500 mm x 167m Polyethylene Pipes inside steel casings with diameter of 1000 mm<\/span><\/li>\n<li><span style=\"line-height: normal;\">600 mm x 45m Polyethylene Pipes inside steel casings with diameter of 1000 mm<\/span><\/li>\n<li><span style=\"line-height: normal;\">Pipe jacking works using steel pipes with nominal diameter of 1000 mm for a length of 352m<\/span><\/li>\n<li><span style=\"line-height: normal;\">Implementation of 11 concrete manholes&nbsp;<\/span><\/li>\n<\/ol>\n<\/blockquote>\n<p><span style=\"line-height: normal;\"><\/span><\/p>\n<p><span style=\"line-height: normal;\"><\/span><\/p>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<\/div>\n<div class=\"art-content-layout-wrapper layout-item-0\">\n<div class=\"art-content-layout layout-item-1\">\n<div class=\"art-content-layout-row\">\n<div class=\"art-layout-cell layout-item-2\" style=\"width: 100%\" >\n<h3>11.\tPiping works for the wastewater network of Sadr Highway&nbsp;<\/h3>\n<\/p>\n<ul>\n<li><span style=\"line-height: normal;\">Employer: Tehran Wastewater Company&nbsp;<\/span><\/li>\n<li><span style=\"line-height: normal;\">Consultant: Mahab Ghodss Consulting Engineers Co.<\/span><\/li>\n<li><span style=\"line-height: normal;\">Contract price: 795.000.000 Rials&nbsp;<\/span><\/li>\n<li><span style=\"line-height: normal;\">Project status: FAC&nbsp;<\/span><\/li>\n<li><span style=\"line-height: normal;\">Progress: 100%<\/span><\/li>\n<li><span style=\"line-height: normal;\">Brief description:<\/span><\/li>\n<\/ul>\n<blockquote>\n<ol>\n<li><span style=\"line-height: normal;\">Steel Pipe jacking works with nominal diameter of 1000 mm for length of 36 m<\/span><\/li>\n<li><span style=\"line-height: normal;\">Double Wall Polyethylene pipeline installation with diameter of 250 mm in traditional tunneling method and with length of 151 m.<\/span><\/li>\n<li><span style=\"line-height: normal;\">Single Wall Polyethylene pipeline installation with diameter of 300 mm in traditional tunneling method and with length of 46 m.<\/span><\/li>\n<li><span style=\"line-height: normal;\">Double Wall Polyethylene pipeline installation with diameter of 400 mm in traditional tunneling method and with length of 190 m.<\/span><\/li>\n<li><span style=\"line-height: normal;\">Double Wall Polyethylene pipeline installation with diameter of 600 mm in traditional tunneling method and with length of 7 m.<\/span><\/li>\n<li><span style=\"line-height: normal;\">Reinforced concreted pipe jacking with diameter of 1000 mm for a length of 55 m<\/span><\/li>\n<li><span style=\"line-height: normal;\">Construction of 17 manholes&nbsp;<\/span><\/li>\n<\/ol>\n<\/blockquote>\n<p><span style=\"line-height: normal;\"><\/span><\/p>\n<\/p>\n<p><span style=\"line-height: normal;\"><\/span><\/p>\n<\/p>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<\/div>\n<div class=\"art-content-layout-wrapper layout-item-4\">\n<div class=\"art-content-layout layout-item-1\">\n<div class=\"art-content-layout-row\">\n<div class=\"art-layout-cell layout-item-2\" style=\"width: 100%\" >\n<h3>12.\tPiping works for the wastewater network of Gheytariyeh- Dowlat , Area 3N-2<\/h3>\n<ul>\n<li>Employer: Tehran Wastewater Company<\/li>\n<li>Consultant: Rayab Consulting Engineers Co.<\/li>\n<li>Contract price: 140.000.000 Rials<\/li>\n<li>Project status: FAC<\/li>\n<li>Progress: 100%<\/li>\n<li>Brief description:<\/li>\n<\/ul>\n<blockquote><p>Polyethylene Piping works with diameter of 300m and length of 49m in traditional tunneling method.<br \/><span style=\"line-height: normal;\"><\/span><\/p><\/blockquote><\/div>\n<\/p><\/div>\n<\/div>\n<\/div>\n<div class=\"art-content-layout-wrapper layout-item-0\">\n<div class=\"art-content-layout layout-item-1\">\n<div class=\"art-content-layout-row\">\n<div class=\"art-layout-cell layout-item-2\" style=\"width: 100%\" >\n<h3>13.\tPiping works for the wastewater network of Nazar Abad Area RN2<\/h3>\n<\/p>\n<ul>\n<li><span style=\"line-height: normal;\">Employer: Wastewater Company, West of Tehran&nbsp;<\/span><\/li>\n<li><span style=\"line-height: normal;\">Consultant: Wastewater Company, West of Tehran&nbsp;<\/span><\/li>\n<li><span style=\"line-height: normal;\">Contract price: 183.000.000 Rials&nbsp;<\/span><\/li>\n<li><span style=\"line-height: normal;\">Project status: FAC&nbsp;<\/span><\/li>\n<li><span style=\"line-height: normal;\">Progress: 100%<\/span><\/li>\n<\/ul>\n<p>Brief description:<\/p>\n<blockquote>\n<ol>\n<li><span style=\"line-height: normal;\">Steel Pipe jacking works with nominal diameter of 1000 mm for length of 36 m at intersection site located between the main water transmission lines (Nazarabad) and Tehran-Tabriz railway&nbsp;<\/span><\/li>\n<li><span style=\"line-height: normal;\">Installation of 36 m of steel pipes with a length of 600 mm inside a steel casing with diameter of 1000 mm<\/span><\/li>\n<\/ol>\n<\/blockquote>\n<p><span style=\"line-height: normal;\"><\/span><\/p>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<\/div>\n<div class=\"art-content-layout-wrapper layout-item-0\">\n<div class=\"art-content-layout\">\n<div class=\"art-content-layout-row\">\n<div class=\"art-layout-cell\" style=\"width: 50%\" >\n<p style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" width=\"304\" height=\"200\" alt=\"\" class=\"art-lightbox\" src=\"http:\/\/baadbandsaz.com\/en\/wp-content\/uploads\/2015\/06\/131-2.jpg\"><\/p>\n<\/p><\/div>\n<div class=\"art-layout-cell\" style=\"width: 50%\" >\n<p style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" width=\"141\" height=\"200\" alt=\"\" class=\"art-lightbox\" src=\"http:\/\/baadbandsaz.com\/en\/wp-content\/uploads\/2015\/06\/132-2.jpg\"><\/p>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<\/div>\n<div class=\"art-content-layout-wrapper layout-item-0\">\n<div class=\"art-content-layout layout-item-1\">\n<div class=\"art-content-layout-row\">\n<div class=\"art-layout-cell layout-item-2\" style=\"width: 100%\" >\n<h3>14.\tWastewater collection networks installation Of Rasht in zone 2,14,15,20 and LSP station<\/h3>\n<\/p>\n<ul>\n<li><span style=\"line-height: normal;\">Employer: Guilan Water &amp; Wastewater Company&nbsp;<\/span><\/li>\n<li><span style=\"line-height: normal;\">Consultant: Iranab Consulting Engineers Co.<\/span><\/li>\n<li><span style=\"line-height: normal;\">Contract price: 32.228.000.000 Rials&nbsp;<\/span><\/li>\n<li><span style=\"line-height: normal;\">Project status: FAC is in process<\/span><\/li>\n<li><span style=\"line-height: normal;\">Progress: 85%<\/span><\/li>\n<li><span style=\"line-height: normal;\">Brief description:<\/span><\/li>\n<\/ul>\n<blockquote>\n<ol>\n<li><span style=\"line-height: normal;\">Polyethylene piping works for a wastewater pipeline with diameter of 400-315-250-200-160 mm and 1260-3060-1200-45780-4150 m (Total 55450m) of length, in traditional tunneling method&nbsp;<\/span><\/li>\n<li><span style=\"line-height: normal;\">Construction of 1700 concrete manholes&nbsp;<\/span><\/li>\n<li><span style=\"line-height: normal;\">GRP pipe installation with diameter of 500mm and 100m of length.<\/span><\/li>\n<\/ol>\n<\/blockquote>\n<div style=\"margin-left: 2em\"><\/div>\n<\/p>\n<p><span style=\"line-height: normal;\"><\/span><\/p>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<\/div>\n<div class=\"art-content-layout-wrapper layout-item-0\">\n<div class=\"art-content-layout\">\n<div class=\"art-content-layout-row\">\n<div class=\"art-layout-cell\" style=\"width: 50%\" >\n<p style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"200\" alt=\"\" class=\"art-lightbox\" src=\"http:\/\/baadbandsaz.com\/en\/wp-content\/uploads\/2015\/06\/141-2.jpg\"><\/p>\n<\/p><\/div>\n<div class=\"art-layout-cell\" style=\"width: 50%\" >\n<p style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" width=\"266\" height=\"200\" alt=\"\" class=\"art-lightbox\" src=\"http:\/\/baadbandsaz.com\/en\/wp-content\/uploads\/2015\/06\/142-2.jpg\"><\/p>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>1. Piping works for the wastewater network of District 2 of Area NW 1-3, segment three: Employer: Tehran Wastewater Company&nbsp; Consultant: Rayab Consulting Engineers Co. Contract price: 1.745.000.000 Rials&nbsp; Project status: FAC&nbsp; Progress: 100% Brief description: Performance of Piping Works for a Wastewater Polyethylene Pipeline with diameter of 250mm x 4,734m (in traditional tunneling method) [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":425,"menu_order":17,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-426","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/baadbandsaz.com\/en\/wp-json\/wp\/v2\/pages\/426","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/baadbandsaz.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/baadbandsaz.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/baadbandsaz.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/baadbandsaz.com\/en\/wp-json\/wp\/v2\/comments?post=426"}],"version-history":[{"count":0,"href":"https:\/\/baadbandsaz.com\/en\/wp-json\/wp\/v2\/pages\/426\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/baadbandsaz.com\/en\/wp-json\/wp\/v2\/pages\/425"}],"wp:attachment":[{"href":"https:\/\/baadbandsaz.com\/en\/wp-json\/wp\/v2\/media?parent=426"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}