{"id":427,"date":"2015-06-30T10:30:31","date_gmt":"2015-06-30T06:00:31","guid":{"rendered":"http:\/\/baadbandsaz.com\/en\/projects\/completed-projects\/concrete-reservoir\/"},"modified":"2015-06-30T10:30:31","modified_gmt":"2015-06-30T06:00:31","slug":"concrete-reservoir","status":"publish","type":"page","link":"https:\/\/baadbandsaz.com\/en\/projects\/completed-projects\/concrete-reservoir\/","title":{"rendered":"Concrete Reservoir"},"content":{"rendered":"<div class=\"art-content-layout-wrapper layout-item-0\">\n<div class=\"art-content-layout layout-item-1\">\n<div class=\"art-content-layout-row\">\n<div class=\"art-layout-cell layout-item-2\" style=\"width: 100%\" >\n<h3>1.\tConstruction of a Concrete reservoir with capacity of 15000 m3 and utilities in Langerood city.<\/h3>\n<\/p>\n<ul>\n<li><span style=\"line-height: normal;\">Employer: Guilan Regional Water Company&nbsp;<\/span><\/li>\n<li><span style=\"line-height: normal;\">Consultant: IranAb Consulting Engineers Co.<\/span><\/li>\n<li><span style=\"line-height: normal;\">Contract price: 13.980.000.000 Rials<\/span><\/li>\n<li><span style=\"line-height: normal;\">Project status: FAC<\/span><\/li>\n<li><span style=\"line-height: normal;\">Progress: 100%<\/span><\/li>\n<li><span style=\"line-height: normal;\">Brief description:&nbsp;<\/span><\/li>\n<\/ul>\n<blockquote><p>The project was implemented in the downstream of Leila Kuh Heights. Including a ground tank with a capacity of 15000 m3 and the respective pump station as well as an interconnecting metallic pipes with diameter of 800 mm. and buildings (such as office, chlorination, post-transformer, emergency diesel generator, and storage buildings).<\/p><\/blockquote>\n<ul>\n<li><span style=\"line-height: normal;\">Materials and works required:<\/span><\/li>\n<\/ul>\n<\/p>\n<ol>\n<li><span style=\"line-height: normal;\">More than 427000 kg of reinforced bars in various sizes<\/span><\/li>\n<li><span style=\"line-height: normal;\">The volume of used concrete: app. 5230 m3<\/span><\/li>\n<li><span style=\"line-height: normal;\">The volume of earthwork: app. 33000 m3<\/span><\/li>\n<li><span style=\"line-height: normal;\">Rock works: more than 13000 m3<\/span><\/li>\n<\/ol>\n<p><span style=\"line-height: normal;\"><\/span><\/p>\n<p><span style=\"line-height: normal;\"><\/span><\/p>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<\/div>\n<div class=\"art-content-layout-wrapper layout-item-0\">\n<div class=\"art-content-layout\">\n<div class=\"art-content-layout-row\">\n<div class=\"art-layout-cell\" style=\"width: 50%\" >\n<p style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" width=\"266\" height=\"200\" alt=\"\" class=\"art-lightbox\" src=\"http:\/\/baadbandsaz.com\/en\/wp-content\/uploads\/2015\/06\/181-2-2.jpg\"><\/p>\n<\/p><\/div>\n<div class=\"art-layout-cell\" style=\"width: 50%\" >\n<p style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" width=\"266\" height=\"200\" alt=\"\" class=\"art-lightbox\" src=\"http:\/\/baadbandsaz.com\/en\/wp-content\/uploads\/2015\/06\/182-2-2.jpg\"><\/p>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<\/div>\n<div class=\"art-content-layout-wrapper layout-item-0\">\n<div class=\"art-content-layout layout-item-3\">\n<div class=\"art-content-layout-row\">\n<div class=\"art-layout-cell layout-item-2\" style=\"width: 100%\" >\n<h3>2.\tConstruction of a Concrete reservoir with a capacity of 2*17500 m3 in Tehran Wastewater Treatment 5th site.<\/h3>\n<\/p>\n<ul>\n<li><span style=\"line-height: normal;\">Employer: Tehran Supply and Treatment of Water &amp; Wastewater Company&nbsp;<\/span><\/li>\n<li><span style=\"line-height: normal;\">Consultant: Yekom Consulting Engineers Co.<\/span><\/li>\n<li><span style=\"line-height: normal;\">Contract price: 25.891.000.0000 Rials&nbsp;<\/span><\/li>\n<li><span style=\"line-height: normal;\">Project status: FAC&nbsp;<\/span><\/li>\n<li><span style=\"line-height: normal;\">Progress: 100%<\/span><\/li>\n<li><span style=\"line-height: normal;\">Brief description:&nbsp;<\/span><\/li>\n<\/ul>\n<blockquote>\n<p>Construction of two concrete tanks with a capacity of 17500 m3 and a culvert from the module of the under operation fifth treatment plant;&nbsp;<\/p>\n<p>Construction and operation of relevant mechanical equipment.<\/p>\n<\/blockquote>\n<ul>\n<li><span style=\"line-height: normal;\">Materials and works required:<\/span><\/li>\n<\/ul>\n<\/p>\n<ol>\n<li><span style=\"line-height: normal;\">More than 1,460,000kg of reinforced bars in various diameters<\/span><\/li>\n<li><span style=\"line-height: normal;\">The volume of used concrete: app. 10,800 m3<\/span><\/li>\n<li><span style=\"line-height: normal;\">The volume of earthwork: app. 41,000 m3<\/span><\/li>\n<li><span style=\"line-height: normal;\">Molding works: more than 24,000 m2<\/span><\/li>\n<\/ol>\n<p><span style=\"line-height: normal;\"><\/span><\/p>\n<p><span style=\"line-height: normal;\"><\/span><\/p>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<\/div>\n<div class=\"art-content-layout-wrapper layout-item-0\">\n<div class=\"art-content-layout\">\n<div class=\"art-content-layout-row\">\n<div class=\"art-layout-cell\" style=\"width: 50%\" >\n<p style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" width=\"267\" height=\"200\" alt=\"\" class=\"art-lightbox\" src=\"http:\/\/baadbandsaz.com\/en\/wp-content\/uploads\/2015\/06\/221-2-2.jpg\"><\/p>\n<\/p><\/div>\n<div class=\"art-layout-cell\" style=\"width: 50%\" >\n<p style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" width=\"267\" height=\"200\" alt=\"\" class=\"art-lightbox\" src=\"http:\/\/baadbandsaz.com\/en\/wp-content\/uploads\/2015\/06\/222-2-2.jpg\"><\/p>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<\/div>\n<div class=\"art-content-layout-wrapper layout-item-0\">\n<div class=\"art-content-layout layout-item-1\">\n<div class=\"art-content-layout-row\">\n<div class=\"art-layout-cell layout-item-2\" style=\"width: 100%\" >\n<h3>3.\tConstruction of a Concrete reservoir with a capacity of 50,000m3 in Dezful Wastewater Treatment site.<\/h3>\n<\/p>\n<ul>\n<li><span style=\"line-height: normal;\">Employer: Khuzestan Water &amp; power Company&nbsp;<\/span><\/li>\n<li><span style=\"line-height: normal;\">Consultant: Anhar Jonoob Consulting Engineers Co.<\/span><\/li>\n<li><span style=\"line-height: normal;\">Contract price: 29.890.000.0000 Rials&nbsp;<\/span><\/li>\n<li><span style=\"line-height: normal;\">Project status: FAC&nbsp;<\/span><\/li>\n<li><span style=\"line-height: normal;\">Progress: 100%<\/span><\/li>\n<li><span style=\"line-height: normal;\">Brief description:&nbsp;<\/span><\/li>\n<\/ul>\n<blockquote>\n<p>Construction of two ground concrete tanks with a capacity of 30,000 m3 on the site of the treatment plant on the north of Dezful City;&nbsp;<\/p>\n<p>Construction of the office building for the employer<\/p>\n<p>Construction of access roads and landscaping of the space surrounding the tank<\/p>\n<\/blockquote>\n<ul>\n<li><span style=\"line-height: normal;\">Materials and works required:<\/span><\/li>\n<\/ul>\n<\/p>\n<ol>\n<li><span style=\"line-height: normal;\">More than 1,540,000 kg of reinforced bars in various sizes<\/span><\/li>\n<li><span style=\"line-height: normal;\">The volume of used concrete: app. 17000 m3<\/span><\/li>\n<li><span style=\"line-height: normal;\">The volume of earthwork: app. 30000 m3<\/span><\/li>\n<li><span style=\"line-height: normal;\">Molding works at wall foots and ceilings: more than 46000 m2<\/span><\/li>\n<\/ol>\n<p><span style=\"line-height: normal;\"><\/span><\/p>\n<p><span style=\"line-height: normal;\"><\/span><\/p>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<\/div>\n<div class=\"art-content-layout-wrapper layout-item-0\">\n<div class=\"art-content-layout\">\n<div class=\"art-content-layout-row\">\n<div class=\"art-layout-cell\" style=\"width: 50%\" >\n<p style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" width=\"294\" height=\"165\" alt=\"\" class=\"art-lightbox\" src=\"http:\/\/baadbandsaz.com\/en\/wp-content\/uploads\/2015\/06\/231-2-2.jpg\"><\/p>\n<\/p><\/div>\n<div class=\"art-layout-cell\" style=\"width: 50%\" >\n<p style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" width=\"266\" height=\"200\" alt=\"\" class=\"art-lightbox\" src=\"http:\/\/baadbandsaz.com\/en\/wp-content\/uploads\/2015\/06\/232-2-2.jpg\"><\/p>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<\/div>\n<div class=\"art-content-layout-wrapper layout-item-0\">\n<div class=\"art-content-layout layout-item-1\">\n<div class=\"art-content-layout-row\">\n<div class=\"art-layout-cell layout-item-2\" style=\"width: 100%\" >\n<h3>4.\tConstruction of a Concrete reservoir with a capacity of 50000 m3 in Ahvaz.<\/h3>\n<\/p>\n<ul>\n<li><span style=\"line-height: normal;\">Employer: Ahvaz Water &amp; Wastewater Company&nbsp;<\/span><\/li>\n<li><span style=\"line-height: normal;\">Consultant: Pars Jooyab Consulting Engineers Co.<\/span><\/li>\n<li><span style=\"line-height: normal;\">Contract price: 59.285.000.000 Rials<\/span><\/li>\n<li><span style=\"line-height: normal;\">Project status: FAC<\/span><\/li>\n<li><span style=\"line-height: normal;\">Progress: 100%<\/span><\/li>\n<li><span style=\"line-height: normal;\">Brief description:&nbsp;<\/span><\/li>\n<\/ul>\n<blockquote>\n<p>Construction of a buried concrete tank with a capacity of 50,000 m3 on the site of no. 2 treatment plant of Kian Abad Area of Ahwaz;&nbsp;<\/p>\n<p>Construction of an inflow and outflow network as well as ponds for the relevant valves<\/p>\n<\/blockquote>\n<ul>\n<li><span style=\"line-height: normal;\">Materials and works required:<\/span><\/li>\n<\/ul>\n<\/p>\n<ol>\n<li><span style=\"line-height: normal;\">More than 140,5000 kg of reinforced bars in various sizes<\/span><\/li>\n<li><span style=\"line-height: normal;\">The volume of used concrete: app. 14,174 m3<\/span><\/li>\n<li><span style=\"line-height: normal;\">The volume of earthwork: app. 10,000 m3<\/span><\/li>\n<li><span style=\"line-height: normal;\">Molding works at wall foots and ceilings: more than 41,000 m2<\/span><\/li>\n<\/ol>\n<\/p>\n<div style=\"margin-left: 2em\"><\/div>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<\/div>\n<div class=\"art-content-layout-wrapper layout-item-0\">\n<div class=\"art-content-layout\">\n<div class=\"art-content-layout-row\">\n<div class=\"art-layout-cell\" style=\"width: 50%\" >\n<p style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" width=\"266\" height=\"200\" alt=\"\" class=\"art-lightbox\" src=\"http:\/\/baadbandsaz.com\/en\/wp-content\/uploads\/2015\/06\/241-2-2.jpg\"><\/p>\n<\/p><\/div>\n<div class=\"art-layout-cell\" style=\"width: 50%\" >\n<p style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" width=\"266\" height=\"200\" alt=\"\" class=\"art-lightbox\" src=\"http:\/\/baadbandsaz.com\/en\/wp-content\/uploads\/2015\/06\/242-2-2.jpg\"><\/p>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>1. Construction of a Concrete reservoir with capacity of 15000 m3 and utilities in Langerood city. Employer: Guilan Regional Water Company&nbsp; Consultant: IranAb Consulting Engineers Co. Contract price: 13.980.000.000 Rials Project status: FAC Progress: 100% Brief description:&nbsp; The project was implemented in the downstream of Leila Kuh Heights. Including a ground tank with a capacity [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":425,"menu_order":18,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-427","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/baadbandsaz.com\/en\/wp-json\/wp\/v2\/pages\/427","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/baadbandsaz.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/baadbandsaz.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/baadbandsaz.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/baadbandsaz.com\/en\/wp-json\/wp\/v2\/comments?post=427"}],"version-history":[{"count":0,"href":"https:\/\/baadbandsaz.com\/en\/wp-json\/wp\/v2\/pages\/427\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/baadbandsaz.com\/en\/wp-json\/wp\/v2\/pages\/425"}],"wp:attachment":[{"href":"https:\/\/baadbandsaz.com\/en\/wp-json\/wp\/v2\/media?parent=427"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}