{"id":428,"date":"2015-06-30T10:30:32","date_gmt":"2015-06-30T06:00:32","guid":{"rendered":"http:\/\/baadbandsaz.com\/en\/projects\/completed-projects\/wastewater-treatment\/"},"modified":"2015-06-30T10:30:32","modified_gmt":"2015-06-30T06:00:32","slug":"wastewater-treatment","status":"publish","type":"page","link":"https:\/\/baadbandsaz.com\/en\/projects\/completed-projects\/wastewater-treatment\/","title":{"rendered":"Wastewater Treatment"},"content":{"rendered":"<div class=\"art-content-layout-wrapper layout-item-0\">\n<div class=\"art-content-layout layout-item-1\">\n<div class=\"art-content-layout-row\">\n<div class=\"art-layout-cell layout-item-2\" style=\"width: 100%\" >\n<h3>1. Construction works for construction of the wastewater treatment plant in Lavasan City and the sewage transmission line&nbsp;<\/h3>\n<\/p>\n<ul>\n<li><span style=\"line-height: normal;\">Employer: Water and Wastewater Company, East of Tehran Province<\/span><\/li>\n<li><span style=\"line-height: normal;\">Consultant: Tehran Sahab Consulting Engineers Company&nbsp;<\/span><\/li>\n<li><span style=\"line-height: normal;\">Contract price: 29.854.000.000 Rials<\/span><\/li>\n<li><span style=\"line-height: normal;\">Project status: PAC<\/span><\/li>\n<li><span style=\"line-height: normal;\">Progress: 95%<\/span><\/li>\n<li><span style=\"line-height: normal;\">Brief description of two modules:<\/span><\/li>\n<\/ul>\n<blockquote>\n<p>Works for the construction of the treatment plant including the following: mechanical filter; flow measuring unit (partial flume); sewage distribution structure; telescopic tap pit; foam collection pit; sludge doping silo; sludge dewatering building; treated wastewater pumping station; chlorination unit; manholes leading to the sedimentation ponds; manholes between treatment units; final sedimentation ponds; passage post; reciprocating sludge pumping station; landscaping of streets surrounding the treatment plant; airing ponds; office building; storage and workshop buildings; peripheral buildings.<\/p>\n<p>Capacity: 80,000 person; average discharge: 80.145 liter\/sec; maximum discharge: 240 liter\/sec; capacity: 12,000 m3\/day<\/p>\n<\/blockquote>\n<ul>\n<li><span style=\"line-height: normal;\">Materials and works required:<\/span><\/li>\n<\/ul>\n<\/p>\n<ol>\n<li><span style=\"line-height: normal;\">More than 650,000 kg of reinforced bars in various sizes<\/span><\/li>\n<li><span style=\"line-height: normal;\">The volume of used concrete: app. 60,00 m3<\/span><\/li>\n<li><span style=\"line-height: normal;\">The volume of earthwork: app. 33,000 m3<\/span><\/li>\n<li><span style=\"line-height: normal;\">Rock works: more than 3,500 m3<\/span><\/li>\n<\/ol>\n<p><span style=\"line-height: normal;\"><\/span><\/p>\n<div style=\"margin-left: 2em\"><\/div>\n<p><span style=\"line-height: normal;\"><\/span><\/p>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<\/div>\n<div class=\"art-content-layout-wrapper layout-item-0\">\n<div class=\"art-content-layout layout-item-3\">\n<div class=\"art-content-layout-row\">\n<div class=\"art-layout-cell layout-item-4\" style=\"width: 50%\" >\n<p style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" width=\"266\" height=\"200\" alt=\"\" class=\"art-lightbox\" src=\"http:\/\/baadbandsaz.com\/en\/wp-content\/uploads\/2015\/06\/251.jpg\"><\/p>\n<\/p><\/div>\n<div class=\"art-layout-cell layout-item-4\" style=\"width: 50%\" >\n<p style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" width=\"266\" height=\"200\" alt=\"\" class=\"art-lightbox\" src=\"http:\/\/baadbandsaz.com\/en\/wp-content\/uploads\/2015\/06\/252.jpg\"><\/p>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>1. Construction works for construction of the wastewater treatment plant in Lavasan City and the sewage transmission line&nbsp; Employer: Water and Wastewater Company, East of Tehran Province Consultant: Tehran Sahab Consulting Engineers Company&nbsp; Contract price: 29.854.000.000 Rials Project status: PAC Progress: 95% Brief description of two modules: Works for the construction of the treatment plant [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":425,"menu_order":19,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-428","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/baadbandsaz.com\/en\/wp-json\/wp\/v2\/pages\/428","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/baadbandsaz.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/baadbandsaz.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/baadbandsaz.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/baadbandsaz.com\/en\/wp-json\/wp\/v2\/comments?post=428"}],"version-history":[{"count":0,"href":"https:\/\/baadbandsaz.com\/en\/wp-json\/wp\/v2\/pages\/428\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/baadbandsaz.com\/en\/wp-json\/wp\/v2\/pages\/425"}],"wp:attachment":[{"href":"https:\/\/baadbandsaz.com\/en\/wp-json\/wp\/v2\/media?parent=428"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}