{"id":429,"date":"2015-06-30T10:30:33","date_gmt":"2015-06-30T06:00:33","guid":{"rendered":"http:\/\/baadbandsaz.com\/en\/projects\/completed-projects\/dam-construction\/"},"modified":"2015-06-30T10:30:33","modified_gmt":"2015-06-30T06:00:33","slug":"dam-construction","status":"publish","type":"page","link":"https:\/\/baadbandsaz.com\/en\/projects\/completed-projects\/dam-construction\/","title":{"rendered":"Dam Construction"},"content":{"rendered":"<div class=\"art-content-layout-wrapper layout-item-0\">\n<div class=\"art-content-layout layout-item-1\">\n<div class=\"art-content-layout-row\">\n<div class=\"art-layout-cell layout-item-2\" style=\"width: 100%\" >\n<h3>1. Construction of reservoir dam, deviation dam, and Shakin feeding channel<\/h3>\n<\/p>\n<ul>\n<li><span style=\"line-height: normal;\">Employer: Qazvin Ministry of Agricultural Jihad<\/span><\/li>\n<li><span style=\"line-height: normal;\">Consultant: Abraheh Thought Consulting Engineers Co.<\/span><\/li>\n<li><span style=\"line-height: normal;\">Contract price: 13.598.000.000 Rials<\/span><\/li>\n<li><span style=\"line-height: normal;\">Project status: FAC<\/span><\/li>\n<li><span style=\"line-height: normal;\">Progress: 100%<\/span><\/li>\n<li><span style=\"line-height: normal;\">Brief description :&nbsp;<\/span><\/li>\n<\/ul>\n<blockquote><p>Project location: It is located on the east of Shakin Village, which is a subsidiary of Takestan City in Qazvin Province<\/p><\/blockquote>\n<ol>\n<li><span style=\"line-height: normal;\">A deviation dam with a height of 2 to 4 meters and a length of 30 m<\/span><\/li>\n<li><span style=\"line-height: normal;\">An inlet span with a capacity of 4 m3\/sec<\/span><\/li>\n<li><span style=\"line-height: normal;\">A conduit with maximum capacity of 4 m3\/sec and a length of 700 m<\/span><\/li>\n<li><span style=\"line-height: normal;\">A tank outside of the riverbed with a capacity of one million cubic meters<\/span><\/li>\n<li><span style=\"line-height: normal;\">An earth dam around the tank with a capacity of 250,000 m3 and a height of 13 m<\/span><\/li>\n<\/ol>\n<p><span style=\"line-height: normal;\"><\/span><\/p>\n<p><span style=\"line-height: normal;\"><\/span><\/p>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<\/div>\n<div class=\"art-content-layout-wrapper layout-item-0\">\n<div class=\"art-content-layout\">\n<div class=\"art-content-layout-row\">\n<div class=\"art-layout-cell\" style=\"width: 50%\" >\n<p style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" width=\"266\" height=\"200\" alt=\"\" class=\"art-lightbox\" src=\"http:\/\/baadbandsaz.com\/en\/wp-content\/uploads\/2015\/06\/171-2-3-2.jpg\"><\/p>\n<\/p><\/div>\n<div class=\"art-layout-cell\" style=\"width: 50%\" >\n<p style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" width=\"266\" height=\"200\" alt=\"\" class=\"art-lightbox\" src=\"http:\/\/baadbandsaz.com\/en\/wp-content\/uploads\/2015\/06\/172-2-3-2.jpg\"><\/p>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>1. Construction of reservoir dam, deviation dam, and Shakin feeding channel Employer: Qazvin Ministry of Agricultural Jihad Consultant: Abraheh Thought Consulting Engineers Co. Contract price: 13.598.000.000 Rials Project status: FAC Progress: 100% Brief description :&nbsp; Project location: It is located on the east of Shakin Village, which is a subsidiary of Takestan City in Qazvin [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":425,"menu_order":20,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-429","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/baadbandsaz.com\/en\/wp-json\/wp\/v2\/pages\/429","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/baadbandsaz.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/baadbandsaz.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/baadbandsaz.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/baadbandsaz.com\/en\/wp-json\/wp\/v2\/comments?post=429"}],"version-history":[{"count":0,"href":"https:\/\/baadbandsaz.com\/en\/wp-json\/wp\/v2\/pages\/429\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/baadbandsaz.com\/en\/wp-json\/wp\/v2\/pages\/425"}],"wp:attachment":[{"href":"https:\/\/baadbandsaz.com\/en\/wp-json\/wp\/v2\/media?parent=429"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}