{"id":432,"date":"2015-06-30T10:30:36","date_gmt":"2015-06-30T06:00:36","guid":{"rendered":"http:\/\/baadbandsaz.com\/en\/projects\/current-projects\/"},"modified":"2016-03-29T19:55:40","modified_gmt":"2016-03-29T15:25:40","slug":"current-projects","status":"publish","type":"page","link":"https:\/\/baadbandsaz.com\/en\/projects\/current-projects\/","title":{"rendered":"Current Projects"},"content":{"rendered":"<div class=\"art-content-layout-wrapper layout-item-0\">\n<div class=\"art-content-layout layout-item-1\">\n<div class=\"art-content-layout-row\">\n<div class=\"art-layout-cell layout-item-2\" style=\"width: 100%;\">\n<h3>\n1. Construction works for construction of the wastewater treatment plant in Lavasan City and the sewage transmission line<\/h3>\n<ul>\n<li><span style=\"line-height: normal;\">Employer: Water and Wastewater Company, East of Tehran Province<\/span><\/li>\n<li><span style=\"line-height: normal;\">Consultant: Tehran Sahab Consulting Engineers Company\u00a0<\/span><\/li>\n<li><span style=\"line-height: normal;\">Contract price: 29.854.000.000 Rials<\/span><\/li>\n<li><span style=\"line-height: normal;\">Project status: PAC<\/span><\/li>\n<li><span style=\"line-height: normal;\">Progress: 95%<\/span><\/li>\n<\/ul>\n<p>Brief description of two modules:<\/p>\n<p>&nbsp;<\/p>\n<blockquote><p>Works for the construction of the treatment plant including the following: mechanical filter; flow measuring unit (partial flume); sewage distribution structure; telescopic tap pit; foam collection pit; sludge doping silo; sludge dewatering building; treated wastewater pumping station; chlorination unit; manholes leading to the sedimentation ponds; manholes between treatment units; final sedimentation ponds; passage post; reciprocating sludge pumping station; landscaping of streets surrounding the treatment plant; airing ponds; office building; storage and workshop buildings; peripheral buildings.<\/p>\n<p>Capacity: 80,000 person; average discharge: 80.145 liter\/sec; maximum discharge: 240 liter\/sec; capacity: 12,000 m3\/day<\/p><\/blockquote>\n<p>Materials and works required:<\/p>\n<ol>\n<li><span style=\"line-height: normal;\">More than 650,000 kg of reinforced bars in various sizes<\/span><\/li>\n<li><span style=\"line-height: normal;\">The volume of used concrete: app. 60,00 m3<\/span><\/li>\n<li><span style=\"line-height: normal;\">The volume of earthwork: app. 33,000 m3<\/span><\/li>\n<li><span style=\"line-height: normal;\">Rock works: more than 3,500 m3<\/span><\/li>\n<\/ol>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"art-content-layout-wrapper layout-item-0\">\n<div class=\"art-content-layout layout-item-3\">\n<div class=\"art-content-layout-row\">\n<div class=\"art-layout-cell layout-item-4\" style=\"width: 50%;\">\n<p style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" class=\"art-lightbox\" src=\"http:\/\/baadbandsaz.com\/en\/wp-content\/uploads\/2015\/06\/251-2.jpg\" alt=\"\" width=\"266\" height=\"200\" \/><\/p>\n<\/div>\n<div class=\"art-layout-cell layout-item-4\" style=\"width: 50%;\">\n<p style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" class=\"art-lightbox\" src=\"http:\/\/baadbandsaz.com\/en\/wp-content\/uploads\/2015\/06\/252-3.jpg\" alt=\"\" width=\"266\" height=\"200\" \/><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"art-content-layout-wrapper layout-item-0\">\n<div class=\"art-content-layout layout-item-1\">\n<div class=\"art-content-layout-row\">\n<div class=\"art-layout-cell layout-item-2\" style=\"width: 100%;\">\n<h3>2. Construction of Yazdan and Dobaradaran water tanks in Qom City<\/h3>\n<ul>\n<li><span style=\"line-height: normal;\">Employer: Qom Regional Water Company<\/span><\/li>\n<li><span style=\"line-height: normal;\">Consultant: Mahab Ghodss Consulting Engineers<\/span><\/li>\n<li><span style=\"line-height: normal;\">Contract price: 188,546,000.000\u00a0Rials<\/span><\/li>\n<li><span style=\"line-height: normal;\">Project status: Under Construction<\/span><\/li>\n<li><span style=\"line-height: normal;\">Progress: 60%<\/span><\/li>\n<li><span style=\"line-height: normal;\">Brief description :\u00a0<\/span><\/li>\n<\/ul>\n<blockquote><p>Construction of three tanks with a capacity of 20000 m3 and one additional tank with a capacity of 10000 m3<\/p><\/blockquote>\n<p>Materials and works required:<\/p>\n<ol>\n<li><span style=\"line-height: normal;\">More than 2000000 kg of reinforced bars in various sizes<\/span><\/li>\n<li><span style=\"line-height: normal;\">The volume of used concrete: app. 26000 m3<\/span><\/li>\n<li><span style=\"line-height: normal;\">The volume of earthworks carried out through explosion: app. 277000 m3<\/span><\/li>\n<li><span style=\"line-height: normal;\">Molding works: more than 65000 m2<\/span><\/li>\n<li><span style=\"line-height: normal;\">Piping works using steel pipes with diameters of up to 1600 mm and a length of 4500 m<\/span><\/li>\n<li><span style=\"line-height: normal;\">Piping works using corrugated polyethylene pipes with maximum diameter of 1600 mm and a length of 500 m<\/span><\/li>\n<li><span style=\"line-height: normal;\">Piping works using steel pipes with diameters between 100 to 1600 mm to create one set of pipelines\u00a0<\/span><\/li>\n<li><span style=\"line-height: normal;\">Piping works using two-layer corrugated polyethylene pipes with diameters ranging from 800 to 2000 mm to create a set of pipelines to be linked to the passageway\u00a0<\/span><\/li>\n<li><span style=\"line-height: normal;\">Piping works using PE-90 polyethylene pipes with diameters varying from 32 to 90 mm to create one set of pipelines<\/span><\/li>\n<\/ol>\n<p><span style=\"line-height: normal;\">\u00a0<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"art-content-layout-wrapper layout-item-0\">\n<div class=\"art-content-layout\">\n<div class=\"art-content-layout-row\">\n<div class=\"art-layout-cell\" style=\"width: 50%;\">\n<p style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" class=\"art-lightbox\" src=\"http:\/\/baadbandsaz.com\/en\/wp-content\/uploads\/2015\/06\/261-2.jpg\" alt=\"\" width=\"266\" height=\"200\" \/><\/p>\n<\/div>\n<div class=\"art-layout-cell\" style=\"width: 50%;\">\n<p style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" class=\"art-lightbox\" src=\"http:\/\/baadbandsaz.com\/en\/wp-content\/uploads\/2015\/06\/252-2-2.jpg\" alt=\"\" width=\"266\" height=\"200\" \/><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"art-content-layout-wrapper layout-item-0\">\n<div class=\"art-content-layout layout-item-1\">\n<div class=\"art-content-layout-row\">\n<div class=\"art-layout-cell layout-item-2\" style=\"width: 100%;\">\n<h3>3. Construction of the secondary and semi-primary sewage network of Kashan, districts D and F<\/h3>\n<ul>\n<li><span style=\"line-height: normal;\">Employer: Kashan Water &amp; Wastewater Company<\/span><\/li>\n<li><span style=\"line-height: normal;\">Consultant: Toossab Consulting Engineers<\/span><\/li>\n<li><span style=\"line-height: normal;\">Contract price: 625,764,000.000\u00a0Rials<\/span><\/li>\n<li><span style=\"line-height: normal;\">Project status: FAC<\/span><\/li>\n<li><span style=\"line-height: normal;\">Progress: 100%<\/span><\/li>\n<li><span style=\"line-height: normal;\">Brief description :\u00a0<\/span><\/li>\n<\/ul>\n<blockquote><p>The project included piping works using sewage corrugated polyethylene pipes of 200, 250, 300, and 400 mm diameters with lengths of 67750, 2240, 1650 and 590 m (total: 72230 m), respectively. The piping was carried out through tunneling and open trenching methods; 2000 pre-cast concrete manholes as well as 14400 household branches were also constructed.<\/p><\/blockquote>\n<p><span style=\"color: #000000;\">\u00a0<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"art-content-layout-wrapper layout-item-0\">\n<div class=\"art-content-layout\">\n<div class=\"art-content-layout-row\">\n<div class=\"art-layout-cell\" style=\"width: 50%;\">\n<p style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" class=\"art-lightbox\" src=\"http:\/\/baadbandsaz.com\/en\/wp-content\/uploads\/2015\/06\/271-2.jpg\" alt=\"\" width=\"266\" height=\"200\" \/><\/p>\n<\/div>\n<div class=\"art-layout-cell\" style=\"width: 50%;\">\n<p style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" class=\"art-lightbox\" src=\"http:\/\/baadbandsaz.com\/en\/wp-content\/uploads\/2015\/06\/272-2.jpg\" alt=\"\" width=\"266\" height=\"200\" \/><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>1. Construction works for construction of the wastewater treatment plant in Lavasan City and the sewage transmission line Employer: Water and Wastewater Company, East of Tehran Province Consultant: Tehran Sahab Consulting Engineers Company\u00a0 Contract price: 29.854.000.000 Rials Project status: PAC Progress: 95% Brief description of two modules: &nbsp; Works for the construction of the treatment [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":424,"menu_order":23,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-432","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/baadbandsaz.com\/en\/wp-json\/wp\/v2\/pages\/432","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/baadbandsaz.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/baadbandsaz.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/baadbandsaz.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/baadbandsaz.com\/en\/wp-json\/wp\/v2\/comments?post=432"}],"version-history":[{"count":2,"href":"https:\/\/baadbandsaz.com\/en\/wp-json\/wp\/v2\/pages\/432\/revisions"}],"predecessor-version":[{"id":498,"href":"https:\/\/baadbandsaz.com\/en\/wp-json\/wp\/v2\/pages\/432\/revisions\/498"}],"up":[{"embeddable":true,"href":"https:\/\/baadbandsaz.com\/en\/wp-json\/wp\/v2\/pages\/424"}],"wp:attachment":[{"href":"https:\/\/baadbandsaz.com\/en\/wp-json\/wp\/v2\/media?parent=432"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}